Do handymen typically charge by the job or by the hour?

Fixed fee per job
52%
By the hour (plus material cost)
38%
Not sure
8%
Get Free Quotes Today!
Question: Do handymen typically charge by the job or by the hour?
Top Answer (52% of 178 votes): Fixed fee per job.

Answer: By the hour (plus material cost)
Explanation: Hourly rate plus the total cost for all materials used on that specific job
Ames Construction
Answer: Fixed fee per job
Explanation: Handymen typically charge either by the job or by the hour, depending on the type of work and the preferences of the business. A fixed fee per job, as used by Quick Fix Joe, offers customers a clear understanding of the total cost upfront, which can be beneficial for budget planning. This method eliminates surprises regarding additional hours or extended labor costs. It often aligns well with jobs where the scope is clear and predictable, providing both transparency and predictability in billing, which enhances customer satisfaction and trust.
Quick Fix Joe
Answer: By the hour (plus material cost)
Explanation: Because every job is different and with so many variables, i think most Handymen charge by the hour to ensure accurate pricing.
PTR UNLIMITED LLC
ProMatcher
Answer: Fixed fee per job
Explanation: Generally, handy services are charged per job. If there is a list of items that need to be fixed and/or installed, an hourly rate is likely to apply.
Alcon Home Services
Answer: Fixed fee per job
Explanation: We never work by the hour, but by the type of work. We are transparent in the prices for items and once you sign that you have accepted the conditions, we close the deal. Credit and Debit Card
HomeinPro
Answer: By the hour (plus material cost)
Explanation: I typically charge by the hour (plus material cost). When doing handyman or remodeling, it often happens that other issues are discovered that also must be addressed to complete a job satisfactorily.
Stone County Services
ProMatcher
Answer: Fixed fee per job
Explanation: Typically I charge a fixed fee plus the materials needed for that job.
Giddurdunn LLC
Answer: By the hour (plus material cost)
Explanation: Most jobs I bill hourly plus materials. But certain services for example, tv mounting or furniture assembly, can be quoted for a flat rate.
Finishing Touch Improvements LLC.
Answer: Fixed fee per job
Explanation: Some jobs I do hourly some is by the job just got to see what you got
Golden deer
ProMatcher
Answer: Not sure
Explanation: Fees for specific jobs plus materials.
HandyMike Handyman Services
Answer: Fixed fee per job
Explanation: Fixed scales on charges ensures each customer is treated equally.
Bird's Nesting
Answer: Fixed fee per job
Explanation: I as well as my customers have found it alot more beneficial knowing the exact cost of the job.It protects them in case of an unforseen problem such as excessive rot in existing framing ,etc.Upfront inspections help in detouring such incidents.
Able-1 Handyman Services
ProMatcher
Answer: Not sure
Explanation: I believe it probably depends on the handyman and the job we typically charge larger projects by the job and smaller ones hourly.
Goodman paint and repair
Answer: By the hour (plus material cost)
Explanation: Depends on the scope of work a flat rate would be applied
All1Tech Solutions
Answer: Fixed fee per job
Explanation: Depends on the job and manydiffrant factors
Kyle korobey
ProMatcher
Answer: By the hour (plus material cost)
Explanation: Depending on the complexity of the job and location is the determination on wages.
New's Handyman Service
Answer: Fixed fee per job
Explanation: Charged a fix rate to cover materials and total number of hours times 2
Elite Home Repairs
Answer: By the hour (plus material cost)
Explanation: Hourly charge as time is money. Also trip fees to customers who do not hire at that time are common but this charge is typically deducted from services once hired. Customers need to understand that time and gas take away from paid services by other customers so there must be a fee for coming out and not being hired.
Handyman Near Me
ProMatcher
Answer: Fixed fee per job
Explanation: As for myself I usually charge a fixed amount done through a estimate other handyman made you different . I will accommodate hourly pay though just has to do with the job environment and particular jobs being requested.
Asthetic Connection
Answer: Fixed fee per job
Explanation: We charge a fixed fee that is broke down showing labor rate and materials cost.
Trusty Handy Helpers LLC
Answer: Fixed fee per job
Explanation: Depends what your issue is the price will varied and how we charge as well
FLG Home Improvements
ProMatcher
Answer: By the hour (plus material cost)
Explanation: Most jobs are by the hour
CHRISTOPHER ROCCHETTI
Answer: Fixed fee per job
Explanation: At Valley Property Solutions we charge per job at a fixed rate excluding the cost of materials. Two two prices would be labor and then a materials cost. Every job is different, requiring more employees or longer times to completion.
Valley Property Solutions Home Improvement and Repair
Answer: Fixed fee per job
Explanation: Most use a fixed fee, some situations do call for hourly due to scope and or length of project, those are usually done at the estimate phase of the project.
Knockout Solutions
ProMatcher
Answer: Fixed fee per job
Explanation: We rather do things by the job than by the hr. It's not our time that's for sale . It's our skillset and talent.
Maintaining Matters
Answer: By the hour (plus material cost)
Explanation: Handymen typically charge by the hour plus material cost it is the most effective way to estimate job cost but isn’t always the most transparent until work is completed.
Fast Lane Handyman
Answer: Fixed fee per job
Explanation: Every job is unique flat rate is more accurate
Rhaplar LLC
ProMatcher
Answer: By the hour (plus material cost)
Explanation: Typically by that hour plus material cost but I've done some jobs to wear your home already had the materials and I was using my free time so I just gave him a flat fever job I'm not out here to try and get rich you know . I still want too kind of help people
Thunder Struck Handyman LLC
Answer: Fixed fee per job
Explanation: I like for the home owner to know what the full price is so there’s no confusion
joes Pro Services
Answer: By the hour (plus material cost)
Explanation: Price per job plus materials.
La Quinta Co
ProMatcher
Answer: Fixed fee per job
Explanation: its easier to get a fair price for both client and pro.
Renowned Renovations
Answer: Fixed fee per job
Explanation: We Charge a service fee of $49.99 and accordingly per project.
Green Day Home Service’s LLC
Answer: By the hour (plus material cost)
Explanation: Depending on difficulty of job may decide the hourly amount. Some jobs can be more dangerous like cleaning after fire damage. It mainly depends on the specifics of the job.
360 Home Reno
ProMatcher
Answer: Fixed fee per job
Explanation: I charge per job that will include material cost. Charging by the hour can lead to a higher cost if the installer takes his time to do the repair or install and that cost will be much higher when material still needs to be added. So I'm not a fan of hourly I charge a flat rate for the job including materiel and parts needed to complete the job. It avoids extended hours on job and over charged cost.
24/7 Handyman Service
Answer: Not sure
Explanation: Pricing depends on job and job site factors
Handy Helpers LLC
Answer: Fixed fee per job
Explanation: We charge for all work by the job needing done. We do not charge by the hour. We give free estimates!
S&S Handyman Services LLC
ProMatcher
Answer: Fixed fee per job
Explanation: Depending on your situation hourly or fixes rat
Broyles renovation services llc
Answer: By the hour (plus material cost)
Explanation: I normally charge for the work by the hour but occasionally a customer may want a total job cost estimate which I would provide
RR Services
Answer: Fixed fee per job
Explanation: Well it depends on the work that needs to be done
Ramirez lawn care an handyman services
ProMatcher
Answer: By the hour (plus material cost)
Explanation: Usually handy man work will be charged per hour with material cost.
Veteran Paint Squad
Answer: Fixed fee per job
Explanation: Northeast Handyman prices are based by the job
Northeast Handyman
Answer: Not sure
Explanation: Depends on the job, if it is complex where details change constantly then hourly is more straightforward
DoneRite R and C services
ProMatcher
Answer: Fixed fee per job
Explanation: I charge by the job not the hour
A/C handyman service
Answer: Fixed fee per job
Explanation: I charge per job based on how many items we can discuss price over digital correspondence email, text etc
Handyman Service Tech LLC
Answer: Fixed fee per job
Explanation: Every job is different
Skilled Service, Repair & Installation
ProMatcher
Answer: By the hour (plus material cost)
Explanation: Typically it depends on the job, some clients want a hard number to work with and others are more comfortable paying by the hour.
T&D Services
Answer: Not sure
Explanation: I learned it is more appropriate to assess the requested job/project first because each job is viewed differently by the potential customer. I always aim to meet the customer's expectations.
Handyman Eddie Services
Answer: By the hour (plus material cost)
Explanation: By charging by the hour, the provider is more worried about their quality of service rather than their profit margin.
Burlison Home Services LLC
ProMatcher
Answer: Not sure
Explanation: Each company is different, as is each job. Water damage jobs can be harder to do a fixed price on because some damage can not be seen till you open the wall or floor. If you under bid you can make little or even come out of pocket. If you bid high you could lose the job or make out well. Bidding the job can be a gamble especially for new business just starting out. I like to offer both prices up front and explain the difference to the home owner and let them choose which is best for them.
Shenandoah Valley General Services
Answer: By the hour (plus material cost)
Explanation: It ultimately depends on the project at hand. If they're a combine smaller type projects that will fall in the hourly section. I.E; Small drywall repair, caulking, yard work etc Bugger scaled projects suck as drywall installing, full room painting, bathroom remodle etc.
D-Lite Handyman LLC
Answer: By the hour (plus material cost)
Explanation: Mostly I charge an hourly rate but can also give a firm bid on a project
A 3rd Hand LLC
ProMatcher
Answer: Not sure
Explanation: Depends what works best for the client
LKT TimeSavers
Answer: Fixed fee per job
Explanation: Jami-sons Removal & Repair typically charges by the job. I would come to your residence/commercial to give you a free quote.
Jami-sons removal & repair
Answer: By the hour (plus material cost)
Explanation: Charges are usually determined by the job, some projects are hourly and some projects are by the job.
Cowboy Customs Handyman Services
ProMatcher
Answer: By the hour (plus material cost)
Explanation: This is usually the cheapest way to the customer, however large jobs do benefit from fixed fees
John Darren's LLC
Answer: By the hour (plus material cost)
Explanation: For general handyman work we charge by the hour
Dawns Handyman Services
Answer: By the hour (plus material cost)
Explanation: MOST ARE BASED ON TIME & MATERIALS EXCEPT FOR ASSEMBLY PRODUCTS HAVE SUGGESTED ASSEMBLY TIMES NOTED ON THE INSTRUCTION SHEET. BUT THIS TIME IS RELATED TO A HOMEOWNER AND HIS TOOLS WITH NO LITTLE OR NO EXPERIENCE. LOWELL DOES THIS ON A DAILY BASIS WITH PROPER TOOLS, SO THE TIME IS NORMALLY REDUCED BY 1/3.
LOWELL'S REPAIR LLC
ProMatcher
Answer: Fixed fee per job
Explanation: Most jobs are a fixed rate to make it fair for the customer as we are detail oriented wouldn’t be fair to charge by the hour because it takes longer to get the perfection
A+ lawn & home services llc
Answer: Fixed fee per job
Explanation: All depend on the project that will be completed
D'S Construction
Answer: Fixed fee per job
Explanation: Usualy charge by job but depends on type of woek required
B C Home improvement (Handyman Service)
ProMatcher
Answer: Not sure
Explanation: It depends some jobs are so small that can't charge by the hour, then some are unpredictable where as you can't give a time table.
3D Home Repairs
Answer: By the hour (plus material cost)
Explanation: We actually let the customers decide. We tell then an hourly rate plus materials or we can give a turnkey job estimate.
Coastline Handyman Services
Answer: Fixed fee per job
Explanation: Most of my feel more comfortably with this pricing method.
derol construction
ProMatcher
Answer: Not sure
Explanation: I believe a majority charge by the hour, but we offer flat rate pricing for most jobs as we have found a lot of customers prefer that so they know exactly what it will cost them per task.
Construct Boss
Answer: By the hour (plus material cost)
Explanation: This turns into a fixed fee if it a typical repair. When it is not common fix the hour and material varies the cost.
Kair
Answer: Fixed fee per job
Explanation: I feel like charging by the job is better for the homeowner cause a lot of people who do hourly like to ride the clock so they get paid more at the homeowners expense
Hooper's home improvement & handyman services llc
ProMatcher
Answer: By the hour (plus material cost)
Explanation: depending on the complexity of the job and agreement between us and the customer
ranbservices
Answer: Fixed fee per job
Explanation: Sometimes it depending on the job
Hayes handymanservices
Answer: Fixed fee per job
Explanation: A good handyman should charge by the job. In most circumstances he should know how long it will take to complete. By pricing this way the customer knows up front what the cost is.
Ward Kitchen & Bath
ProMatcher
Answer: By the hour (plus material cost)
Explanation: It depends can do by the hour or I like fixed price when can
virginia call
Answer: By the hour (plus material cost)
Explanation: We offer two quote types hourly based and flat fee for your choice.
Any Assembly
Answer: Not sure
Explanation: I would guess that handyman can charge both ways depending on the type of job, time frame of the job, and based on the customers needs.
J&S Handyman Services
ProMatcher
Answer: By the hour (plus material cost)
Explanation: Its hard to answer that one it really depends on the job.
Matt's Handyman Services
Answer: Fixed fee per job
Explanation: We charge by the job, we give individual estimates based on the size of the job.
K & S Home Services, LLC
Answer: By the hour (plus material cost)
Explanation: This is an easy way to work with costumers with small budgets
Kane Leal handyman
ProMatcher
Get Free Quotes Today!
Find Local Pros
Free Residential Handyman Services Cost Estimates

Related Questions

How Much Does Grab Bar Installation Cost?

How Much Do Handyman Services Cost?

Do most handymen charge a higher hourly rate on weekends?Top answer: In some cases

Will a handyman use materials that I have pre-purchased?Top answer: In most cases

Do most handymen offer a warranty or satisfaction guarantee on the work they complete?Top answer: In some cases



Free Cost Estimates   |   Handyman Services Directory   |   Handyman Cost Report   |   Free Business Listing



All users of ProMatcher.com are subject to our terms of use.

Home   |   Articles & Videos   |   Affiliates   |   Networking Groups   |   Search by Category

Terms of Use   |   Privacy   |   Partner Network   |   Your Privacy Choices   |   About Us   |   Contact Us   |   Member Login

©2003-2024 - VentureStreet, LLC

Join Our Business Network