Answer: Not sure Explanation: The charges change since if it is a simple job then it will be charged hourly such as putting in a new door. However, when it comes to drywall or painting it is charged by square footage instead since hourly for that type of work would cost more for the customer. |
Draper Contracting |
Answer: Fixed fee per job Explanation: Some jobs require a higher skill level than others so I charge customers by the job rather than by the hour. |
JC Handyman Services |
Answer: Not sure Explanation: It all depends on the job. Some do hour. Some do per job. I do both. It all depends on who you hire and their rates. |
On Time ELITE Handyman Services |
|
ProMatcher |
Answer: Fixed fee per job Explanation: Handymen typically charge either by the job or by the hour, depending on the type of work and the preferences of the business. A fixed fee per job, as used by Quick Fix Joe, offers customers a clear understanding of the total cost upfront, which can be beneficial for budget planning. This method eliminates surprises regarding additional hours or extended labor costs. It often aligns well with jobs where the scope is clear and predictable, providing both transparency and predictability in billing, which enhances customer satisfaction and trust.
|
Quick Fix Joe |
Answer: By the hour (plus material cost) Explanation: Because every job is different and with so many variables, i think most Handymen charge by the hour to ensure accurate pricing. |
PTR UNLIMITED LLC |
Answer: Fixed fee per job Explanation: Jobs are bid through company email and agreed upon by both parties before project begins |
APHS INC |
|
ProMatcher |
Answer: Fixed fee per job Explanation: We never work by the hour, but by the type of work. We are transparent in the prices for items and once you sign that you have accepted the conditions, we close the deal. Credit and Debit Card |
HomeinPro |
Answer: By the hour (plus material cost) Explanation: I typically charge by the hour (plus material cost). When doing handyman or remodeling, it often happens that other issues are discovered that also must be addressed to complete a job satisfactorily. |
Stone County Services |
Answer: By the hour (plus material cost) Explanation: If the project is a large one I usually will give a project estimate. If the project is small, like a day or so I'll usually go by the hour. Most repair projects seem to run into un-for-seens that make it hard to give a project quote but is most fairly quoted by the hour plus cost of material. |
Endicott Handyman Service |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: Most jobs I bill hourly plus materials. But certain services for example, tv mounting or furniture assembly, can be quoted for a flat rate. |
Finishing Touch Improvements LLC. |
Answer: Fixed fee per job Explanation: Some jobs I do hourly some is by the job just got to see what you got |
Golden deer |
Answer: Fixed fee per job Explanation: Depends on the job.
If small job will be fixed price. Large job is by the hour. |
Team Royal Handy Service |
|
ProMatcher |
Answer: Fixed fee per job Explanation: Fixed scales on charges ensures each customer is treated equally. |
Bird's Nesting |
Answer: Fixed fee per job Explanation: I as well as my customers have found it alot more beneficial knowing the exact cost of the job.It protects them in case of an unforseen problem such as excessive rot in existing framing ,etc.Upfront inspections help in detouring such incidents. |
Able-1 Handyman Services |
Answer: Fixed fee per job Explanation: I charge by job plus matiral |
Srader’s construction |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: Depends on the scope of work a flat rate would be applied |
All1Tech Solutions |
Answer: Fixed fee per job Explanation: Depends on the job and manydiffrant factors |
Kyle korobey |
Answer: Fixed fee per job Explanation: Each job is different this why there is an estimate of work that will explain process and materials needed to finish the job. |
Home Inspection & Maintenance LLC |
|
ProMatcher |
Answer: Fixed fee per job Explanation: Charged a fix rate to cover materials and total number of hours times 2 |
Elite Home Repairs |
Answer: By the hour (plus material cost) Explanation: Hourly charge as time is money. Also trip fees to customers who do not hire at that time are common but this charge is typically deducted from services once hired. Customers need to understand that time and gas take away from paid services by other customers so there must be a fee for coming out and not being hired. |
Handyman Near Me |
Answer: Fixed fee per job Explanation: Affordable cost across the board |
Heavenly Hands |
|
ProMatcher |
Answer: Fixed fee per job Explanation: We charge a fixed fee that is broke down showing labor rate and materials cost. |
Trusty Handy Helpers LLC |
Answer: Fixed fee per job Explanation: Depends what your issue is the price will varied and how we charge as well |
FLG Home Improvements |
Answer: By the hour (plus material cost) Explanation: NOTE: Usually charge for LABOR! seperate from supplies.
LABOR MAY VARY! according to type of work to be done.
DEPOSIT IS REQUIRED!
NOTE: SUPPLIES! CHARGED for are SEPARATE! but require an up front FEE! or ALLOWANCE! for purchasing. |
Scala's Handyman Contractors LLC. |
|
ProMatcher |
Answer: Fixed fee per job Explanation: At Valley Property Solutions we charge per job at a fixed rate excluding the cost of materials. Two two prices would be labor and then a materials cost. Every job is different, requiring more employees or longer times to completion. |
Valley Property Solutions Home Improvement and Repair |
Answer: Fixed fee per job Explanation: Most use a fixed fee, some situations do call for hourly due to scope and or length of project, those are usually done at the estimate phase of the project. |
Knockout Solutions |
Answer: Fixed fee per job Explanation: We can price and bill our jobs and labor to meet each customers needs. |
franks handyman service |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: Handymen typically charge by the hour plus material cost it is the most effective way to estimate job cost but isn’t always the most transparent until work is completed. |
Fast Lane Handyman |
Answer: Fixed fee per job Explanation: Every job is unique flat rate is more accurate |
Rhaplar LLC |
Answer: Fixed fee per job Explanation: In most small jobs we have a set fee. There are circumstances that can change the fees, and for larger jobs we give our clients an estimate for the entire project. |
1 Call Property Maintenance LLC |
|
ProMatcher |
Answer: Fixed fee per job Explanation: I like for the home owner to know what the full price is so there’s no confusion |
joes Pro Services |
Answer: By the hour (plus material cost) Explanation: Price per job plus materials. |
La Quinta Co |
Answer: Fixed fee per job Explanation: We try to give our customers the best possible price. Billing per job allows us to do so. |
K&T Paint & Home Improvement Plus |
|
ProMatcher |
Answer: Fixed fee per job Explanation: We Charge a service fee of $49.99 and accordingly per project. |
Green Day Home Service’s LLC |
Answer: By the hour (plus material cost) Explanation: Depending on difficulty of job may decide the hourly amount. Some jobs can be more dangerous like cleaning after fire damage. It mainly depends on the specifics of the job. |
360 Home Reno |
Answer: Fixed fee per job Explanation: Charging by the job is the way I prefer because as I get faster I should not be penalized for experience . experience should be rewarded. Besides hourly pay leads to what is called milking the clock. |
Handyman Keith |
|
ProMatcher |
Answer: Not sure Explanation: Pricing depends on job and job site factors |
Handy Helpers LLC |
Answer: Fixed fee per job Explanation: We charge for all work by the job needing done. We do not charge by the hour. We give free estimates! |
S&S Handyman Services LLC |
Answer: Fixed fee per job Explanation: We have a service charge for estimates of $75 we try to provide a total fixed fee per job. |
NRG Services Corp |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: I normally charge for the work by the hour but occasionally a customer may want a total job cost estimate which I would provide |
RR Services |
Answer: Fixed fee per job Explanation: Well it depends on the work that needs to be done |
Ramirez lawn care an handyman services |
Answer: Not sure Explanation: Per hour or per job |
Lucianos Handyman |
|
ProMatcher |
Answer: Fixed fee per job Explanation: Northeast Handyman prices are based by the job |
Northeast Handyman |
Answer: Not sure Explanation: Depends on the job, if it is complex where details change constantly then hourly is more straightforward |
DoneRite R and C services |
Answer: Fixed fee per job Explanation: Most handyman jobs take less than an hour so unless you have a long honey do list thats been ignored charging by the hour just does not work. |
CLK Drywall & Handyman Svcs |
|
ProMatcher |
Answer: Fixed fee per job Explanation: I charge per job based on how many items we can discuss price over digital correspondence email, text etc |
Handyman Service Tech LLC |
Answer: Fixed fee per job Explanation: Every job is different |
Skilled Service, Repair & Installation |
Answer: By the hour (plus material cost) Explanation: Charges are usually hourly $95 an hour depending on the type of job flat rate is required |
Handyman Richard LLC |
|
ProMatcher |
Answer: Not sure Explanation: I learned it is more appropriate to assess the requested job/project first because each job is viewed differently by the potential customer. I always aim to meet the customer's expectations. |
Handyman Eddie Services |
Answer: By the hour (plus material cost) Explanation: By charging by the hour, the provider is more worried about their quality of service rather than their profit margin. |
Burlison Home Services LLC |
Answer: Fixed fee per job Explanation: I like to estimate the project as a whole so there's no misunderstanding on hours some may feel are being extended. |
Alionce Handy Pros |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: It ultimately depends on the project at hand. If they're a combine smaller type projects that will fall in the hourly section.
I.E;
Small drywall repair, caulking, yard work etc
Bugger scaled projects suck as drywall installing, full room painting, bathroom remodle etc. |
D-Lite Handyman LLC |
Answer: By the hour (plus material cost) Explanation: Mostly I charge an hourly rate but can also give a firm bid on a project |
A 3rd Hand LLC |
Answer: By the hour (plus material cost) Explanation: Generally I charge per hour (plus material costs), however larger projects would be submitted via a bid proposal. |
Matthew Gottfried |
|
ProMatcher |
Answer: Fixed fee per job Explanation: Jami-sons Removal & Repair typically charges by the job. I would come to your residence/commercial to give you a free quote. |
Jami-sons removal & repair |
Answer: By the hour (plus material cost) Explanation: Charges are usually determined by the job, some projects are hourly and some projects are by the job. |
Cowboy Customs Handyman Services |
Answer: Fixed fee per job Explanation: I like to tell customers a quote before we begin work; my prices are reasonable and I enf up receiving tips on about 80% of my projects. I also have learned to work expiditiously with the proper tools and typically most all small to medium sized projects can be done same day. |
property 360 |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: For general handyman work we charge by the hour |
Dawns Handyman Services |
Answer: By the hour (plus material cost) Explanation: MOST ARE BASED ON TIME & MATERIALS EXCEPT FOR ASSEMBLY PRODUCTS HAVE SUGGESTED ASSEMBLY TIMES NOTED ON THE INSTRUCTION SHEET. BUT THIS TIME IS RELATED TO A HOMEOWNER AND HIS TOOLS WITH NO LITTLE OR NO EXPERIENCE.
LOWELL DOES THIS ON A DAILY BASIS WITH PROPER TOOLS, SO THE TIME IS NORMALLY REDUCED BY 1/3. |
LOWELL'S REPAIR LLC |
Answer: By the hour (plus material cost) Explanation: Some will charge a fixed rate. If the job takes more time than they thought they will start to cut corners. I like to do the job properly and to the best of my abilities. |
Moran Property Inspections |
|
ProMatcher |
Answer: Fixed fee per job Explanation: All depend on the project that will be completed |
D'S Construction |
Answer: Fixed fee per job Explanation: Usualy charge by job but depends on type of woek required |
B C Home improvement (Handyman Service) |
Answer: Not sure Explanation: Both depends on size and the different services we provide like our 24/7 on call service for people who have rental homes and live out of state. |
G And G Service's |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: We actually let the customers decide. We tell then an hourly rate plus materials or we can give a turnkey job estimate. |
Coastline Handyman Services |
Answer: Fixed fee per job Explanation: Most of my feel more comfortably with this pricing method. |
derol construction |
Answer: By the hour (plus material cost) Explanation: Typically you don't know what is going on when speaking over the phone , you could go out to a service call about a backed up toilet and becomes a nightmare. |
Resurrection Rebuilding & Remodeling |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: This turns into a fixed fee if it a typical repair. When it is not common fix the hour and material varies the cost. |
Kair |
Answer: Fixed fee per job Explanation: I feel like charging by the job is better for the homeowner cause a lot of people who do hourly like to ride the clock so they get paid more at the homeowners expense |
Hooper's home improvement & handyman services llc |
Answer: By the hour (plus material cost) Explanation: Most jobs are based on a $30/hour rate. Charges based on specific job needs. |
Indy Urban Renovations, LLC |
|
ProMatcher |
Answer: Fixed fee per job Explanation: Sometimes it depending on the job |
Hayes handymanservices |
Answer: Fixed fee per job Explanation: A good handyman should charge by the job. In most circumstances he should know how long it will take to complete. By pricing this way the customer knows up front what the cost is. |
Ward Kitchen & Bath |
Answer: Fixed fee per job Explanation: We charge by the job Because if we were to charge by the hour We would be losing Because the time it takes to do the average handyman job cost the same amount of gas it cost to get there |
JRT Construction |
|
ProMatcher |
Answer: By the hour (plus material cost) Explanation: We offer two quote types hourly based and flat fee for your choice. |
Any Assembly |
Answer: Not sure Explanation: I would guess that handyman can charge both ways depending on the type of job, time frame of the job, and based on the customers needs. |
J&S Handyman Services |
Answer: Not sure Explanation: it can go both ways if someone wants a list of small items done like change locks, hang a pic paint a door , then I charge hourly. but if they want a bathroom remodel or newwindows I would charge by the job> |
all-phaze handyman & TV install |
|
ProMatcher |